Linear Accelerator Replacement for Penn State Health St. Joseph Medical Center

Linear Accelerator Upgraded at St. Joseph Medical Center

Barton Healthcare provided MEP design and construction services for the addition of a new linear accelerator room at the Penn State Health St. Joseph Medical Center.

The project includes the coordination with Varian for the linear accelerator equipment and Veritas for the vault shielding system.

A new air handling unit will be designed for the new linear accelerator room and upgrades to the existing air handling unit which serves the adjacent vault will be completed.

The existing pre-action fire sprinkler system will be extended to serve the new vault.

Project Overview

total Sq Ft

2,800 sq. ft.

Total Cost

$1.8 million

Completion

January 2019

“Dignissim lacus convallis massa mauris enim ad mattis magnis senectus montes mollis taciti phasellus accumsan bibendum semper blandit suspendisse aptent leo ligula faucibus metus lobortis morbi cras magna vivamus per risus fermentum.”

– Kimberly Weathers, Homeowner

Related Projects