Posts by: Robert Sells, PE, CSI, CCS

HVAC System Selection Considerations

When designing a building, there are some things that are pretty straightforward: plumbing fixtures need water supply and drain; you need lighting to see; power for that lighting and other equipment; and you may also want some telecommunications and life safety/security systems – the things that Make Buildings Work. The fixture types that you choose

Continue Reading →

Project Closeout Starts at the Pre-Construction Meeting

Project closeout should be one of the most celebrated phases of any construction project. The design team can see their knowledge and planning put to actual use; the construction team can pack up their equipment and “turn over the keys” and the owner can finally achieve functional use of the building or area that they

Continue Reading →

Archives

Categories

arc flash Building Information Modeling central plant Chilled Water chiller commissioning Controls Covid-19 Data Center demand controlled ventilation Emergency power Energy FGI Guidelines geothermal heat pump LED LED Lighting LEED lighting Master Plan Pharmacy Power Retro-commissioning service Steam Sustainability